摘 要
本次毕业设计的题目是南京市某高中教学楼。综合考虑建筑地理位置、建筑使用功能和建筑结构安全性能,教学楼采用钢筋混凝土框架结构。南京地区抗震设防为七度,进行结构方案选择时要考虑抗震要求。从结构的安全方面考虑,最好采用规则结构;同时要考虑建筑使用功能要求,并且在建筑立面效果要符合教学楼的特点。综合考虑,选取了本次设计的建筑方案与结构方案。
本设计包括建筑设计和结构设计两大部分。建筑设计主要是确定建筑方案,包括平面、立面和剖面的设计;结构设计主要分为结构方案布置、荷载计算、内力计算、内力组合、截面设计、板设计、楼梯设计和基础设计。设计过程采用手算完成,最后上机进行校核。
由于缺乏实际工程经验,设计过程中,对于平、立、剖建筑设计还存在一些问题;结构计算综合运用能力欠缺,设计时间紧张,设计中错误难免,敬请各位老师批评指正,谢谢!
关键词:建筑设计、结构设计、钢筋混凝土框架结构
Abstract
The topic of my graduation design is Some high school classroom building of Nanjing. Having considered building geographical position, building function and safe performances synthetically of the structure, the building adopt reinforced concrete frame structure. The area of Nanjing sets up defences for antidetonation of seven degrees, the require of antidetonation have to be considered on the scheme choice of the structure. Meanwhile , regular structure is always been choosed account of the structure safety. At the same time, the function of the use of the building and the elevation equipment should also reinforced concrete frame structure considered to make the structure scheme more reasonable. The architectural and structural scheme have been choosed account of the factors referred above.
This design includes two parts: architecture design and structure design. The main task in architecture design is to decide the architecture scheme, such as plane design, facade design and section design; and in structure design is the structure layout, load calculation, internal force calculation and combination, section design, slab design, stairs design and foundation design. All the results in the design are calculated by manual labor,and at the end of the design the results are checked by the computer
Although I go all out into the graduation design, I am still insufficient in plane design, facade design and section design, and am also inadequate in structural calculation ability because of lacking of practical engineering experience. The design process is intense, thus the design is less than satisfactory. All critical opinions and proposals are quite welcomed. Thank you very much dear sirs!
key words: architectural design、structural design 、reinforced concrete frame structure.
选择雅居云录平台进行分户验收二维码电子档案管理的原因与优势与价值如下:
快速生成二维码:完成系统基础设置后,即可生成分户验收二维码备用,无需等待全部资料上传完成。
灵活修正资料:支持资料修正与重新上传,无需重新修改或印制已生成的二维码。
直观房号管理:后台模拟楼层与房号列表,便于快速查找和直观管理。
自动生成详情:填写项目基本信息后,系统自动生成验收详情页面,无需逐页手动录入。
资料分类上传:验收记录、照片、结果表等资料分类上传,避免手动合并,节省整理时间。
渐进式上传:支持逐步上传资料,编制完成一项即可上传,充分利用签字等空闲时间。
批量上传支持:支持验收资料批量上传,避免逐份上传的繁琐操作。
自动规范排版:上传的验收照片自动完成规范排版,无需人工调整。
精美PDF输出:二维码一键生成,系统自动生成精美PDF文件,用户可直接打印。
可视化进度管理:进度看板直观展示分户验收资料整体及分项完成比例,并提供明细清单。