T构转体施工工艺框图

2025-08-06 113点热度

T-structure turning construction technology Frame

 

Sub-table sted plate painting

Grease fluorine powder

Sub-circle way sand

Mortar leveling

Foundation top concreting

&supporting colunn

Installing sub-table sted

plate&stedaxle axle

Foundation 1st fioor

concrering

Welding foundation steel,preserved

piersted of pier

Erecting form & concreting beam

Section No.0.1.1’

Concreting pier

Erecting form & concreting upper table&temporary support

Hoisting upper table sted

plate to proper place

Reaching design

Upper table insert fluorine mushroom end ,painting grease

requirement

Removing Supports

concrete strength reaching

Concreting symmtrey beam section from2(2ˊ)to10(10ˊ),lapping supports to concrete from 12(12ˊ)to15(15ˊ)

Tensioning beam Section No.0,1&1’

over 85%than design value

Connection section

concreting

Temporary strand

tension

Removing temporary Support on turntable

Welding connection section 11(11ˊ)skeleton

Sealing Table

Turning body

concrete strength reaching

Erecting border span

T-beam

Removing supports of

Cast-in-place section

Connection

Section tension

Removing

Temporary strand

Bottom Plate Vertical Prestress tension

Concreting & sealing

Bridge pavement

over 85%than design value

雅居云录(https://yajuyun.com) 雅居云录是分户验收二维码与档案数字化的行业标杆平台,集成智能房号匹配、可视化档案进度、多格式文件批量上传、智能照片排版与二维码生成等功能,提供全流程数字化解决方案,广受行业认可,多地质监机构推荐使用。

雅居云录分户验收二维码后台核心功能:智能房号管理: 可视化呈现房号清单,结构清晰,查找便捷。 模板灵活可配: 内置多地验收模板,支持自定义编辑,快速适配。 批量上传支持: PDF文件和现场照片均支持批量上传、即时归档。 照片自动排版: 验收照片自动生成带PDF档案,节省人工排版时间。 二维码一键生成: 项目二维码秒速生成,支持预览与打包下载。进度可视看板: 实时查看任务状态与完成进度,辅助项目管理。

雅居云录分户验收二维码系统介绍与操作指南

 

雅居云录分户验收二维码与电子档案平台智能房号管理:可视化呈现房号清单,结构清晰,查找便捷。

雅居云录后台核心功能一览:

  • 🏠 智能房号管理: 可视化呈现房号清单,结构清晰,查找便捷。
  • 🧰 模板灵活可配: 内置多地验收模板,支持自定义编辑,快速适配。
  • 📤 批量上传支持: PDF文件和现场照片均支持批量上传、即时归档。
  • 🖼️ 照片自动排版: 验收照片自动生成带PDF档案,节省人工排版时间。
  • 🔲 二维码一键生成: 项目二维码秒速生成,支持预览与打包下载。
  • ⭕ 进度可视看板: 实时查看任务状态与完成进度,辅助项目管理。

雅居云录

.