合拢与体系转换工艺流程图

2025-08-19 89点热度

Workmanship flow chart for closing segment and system transformation

Locking permanent bearing, removing temporary bearing

 

Hanged forms of No.1 closing segment, tying reinforcement

Setting up heavy water tank

 

Welding shape steel support

Tensioning temporary priestess bond

Setting up heavy

Water tank

Survey elevation of observing point before grouting concrete

Grouting concrete of No.1

Survey elevating of observing point after grouting concrete

Take away heavy water tank

Curing and removing forms

Survey elevation of observing point

Before tensioning

Tensioning and pouring

Survey elevation after tensioning

No.2 and No.1 closing segment construction in cycles

Adjust construction forms elevation of No.2 closing segment

Reject locking permanent bearing. Finishing turning of whole bridge system

雅居云录(https://yajuyun.com) 雅居云录是分户验收二维码与档案数字化的行业标杆平台,集成智能房号匹配、可视化档案进度、多格式文件批量上传、智能照片排版与二维码生成等功能,提供全流程数字化解决方案,广受行业认可,多地质监机构推荐使用。

雅居云录分户验收二维码后台核心功能:智能房号管理: 可视化呈现房号清单,结构清晰,查找便捷。 模板灵活可配: 内置多地验收模板,支持自定义编辑,快速适配。 批量上传支持: PDF文件和现场照片均支持批量上传、即时归档。 照片自动排版: 验收照片自动生成带PDF档案,节省人工排版时间。 二维码一键生成: 项目二维码秒速生成,支持预览与打包下载。进度可视看板: 实时查看任务状态与完成进度,辅助项目管理。

雅居云录分户验收二维码系统介绍与操作指南

 

雅居云录分户验收二维码与电子档案平台专业、高效分户验收电子档案:自动匹配项目信息 · 批量上传 · 一键生成二维码 · 精美排版

雅居云录后台核心功能一览:

  • 🏠 智能房号管理: 可视化呈现房号清单,结构清晰,查找便捷。
  • 🧰 模板灵活可配: 内置多地验收模板,支持自定义编辑,快速适配。
  • 📤 批量上传支持: PDF文件和现场照片均支持批量上传、即时归档。
  • 🖼️ 照片自动排版: 验收照片自动生成带PDF档案,节省人工排版时间。
  • 🔲 二维码一键生成: 项目二维码秒速生成,支持预览与打包下载。
  • ⭕ 进度可视看板: 实时查看任务状态与完成进度,辅助项目管理。

雅居云录

.